At least 4 units have to be covered from the Production and Processing Group B.
Production and Processing Group B
3. Are you happy with these proposed optional units and the number required to be taken as a minimum in Group B?
At least 4 units have to be covered from the Production and Processing Group B.
3. Are you happy with these proposed optional units and the number required to be taken as a minimum in Group B?