Prepare landfill sites for the acceptance of inert waste
Overview This standard is about preparing landfill sites for the acceptance of inert waste. It covers directing and monitoring engineering and construction activities for the preparation of landfill cells and associated facilities. It includes making sure all work is in line with legislative requirements, making sure the integrity of geological barriers is protected and that all paperwork and certificates are in place. This is for managers of inert landfill sites.
Performance criteria
You must be able to:
ensure that proposed activities are in line with legislative requirements
ensure that the details of engineering specifications have been agreed with appropriate people prior to the start of operations
confirm that the resources required for engineering activities are provided in accordance with the engineering specification
implement procedures to ensure that engineering activities comply with legislative requirements
communicate the content of engineering proposals to operational staff regarding work to be carried out at appropriate times
maintain procedures to ensure accurate site engineering and quality assurance records are forwarded to the regulatory authority in compliance with legislative requirements
confirm that arrangements have been made for construction to be inspected and approved by the regulatory authorities at appropriate times
implement operational procedures which protect the integrity of geological barriers
maintain environmental protection systems in line with environmental legislation
ensure that accidents, incidents and spillages on site are dealt with in line with regulatory and organisational procedures
ensure work programmes and operational instructions for the preparation of landfill sites are complete and accurate
communicate work programmes and operational instructions to appropriate site personnel at appropriate times
keep accurate records appropriate to the work in approved organisational systems
advise appropriate colleagues and managers about any situations that require their attention
maintain a record of training for all staff employed in site preparation in approved organisational systems
deal with any circumstances which fail to comply with legislative requirements without delay
rectify issues that prevent the continuation of work activities in line with organisational procedures
refer issues which fall outside of your responsibility to appropriate people
Knowledge and Understanding
You need to know and understand:
the legislative requirements for any construction work involved on site
any contractual conditions that apply to cell preparation
requirements for the placement and integrity of geological barriers and their protection from initial layers of inert waste
who to agree engineering specifications with
site procedures for the management control of cell preparation operations
control and management systems needed for surface water drainage and gas and leachate management
the importance of site hydro geological conditions
permit requirements relevant to hydro geological conditions
planning permission, permit requirements and environmental management systems (EMS) relevant to preparing landfill sites
organisational procedures for engineering operations and the supply and use of the resources required
organisational procedures for communicating with operational staff
the operating procedures for all machinery, plant and equipment used in site preparation
record keeping requirements for site conditions, construction progress, completion certificates, regulatory visits, alterations to requirements
the technical skills needed to prepare the site for disposal operations
how to ensure all staff involved in preparation of landfill sites have the required skills
situations that need to be referred to others including accidents, incidents, interruptions to work and who to refer them to
Prepare landfill sites for the acceptance of inert waste
Overview
This standard is about preparing landfill sites for the acceptance of inert waste. It covers directing and monitoring engineering and construction activities for the preparation of landfill cells and associated facilities. It includes making sure all work is in line with legislative requirements, making sure the integrity of geological barriers is protected and that all paperwork and certificates are in place.
This is for managers of inert landfill sites.
Performance criteria
You must be able to:
Knowledge and Understanding
You need to know and understand: